Facility Location
The Loyalist Solar Facility is located in the Township of Stone Mills, Lennox & Addington County, Ontario.
About Our Partnership
The Mohawks of the Bay of Quinte are a full commercial partner with BluEarth Renewables in the Loyalist Solar Facility. Together, we formed Loyalist Solar LP and both parties share in the economic benefits, risks and costs of the joint venture.
We are proud to partner with the Mohawks of the Bay of Quinte, and we work closely with the Nation to provide ongoing, long-term economic benefits to the region.
Learn more about our approach to working with Indigenous Peoples.
Commissioning the Loyalist Solar Facility
Play Now
Additional Resources
The Project is classified as a Class 3 Solar Facility and requires a Renewable Energy Approval (REA) from the Ontario Ministry of the Environment and Climate Change (MOECC) in accordance with Ontario Regulation 359/09 (“O. Reg. 359/09”). A copy of the notice, supporting documentation and REA reports are posted below. For efficiency, we recommend downloading the documents.
- Project Executive Summary Report
- Project Description Report
- Construction Plan Report
- Project Design and Operations Report
- Project Modifications Report
- Decommissioning Plan Report
- Renewable Energy Approval Application
- Renewable Energy Approval
- Project Modifications Report 2 (March 2018)
- Traffic Management Plan (April 2018)
- Amendment to Renewable Energy Approval (August 2018)
- Natural Heritage Assessment: Records Review Report
- Natural Heritage Assessment Site Investigation Report
- Natural Heritage Assessment: Site Investigation Report – Appendix A
- Natural Heritage Assessment: Site Investigation Report – Appendix B
- Natural Heritage Assessment: Site Investigation Report – Appendix C
- Natural Heritage Assessment: Site Investigation Report – Appendix D
- Natural Heritage Assessment: Evaluation of Significance Report
- Natural Heritage Assessment: Evaluation of Significance Report – Appendix A
- Natural Heritage Assessment: Evaluation of Significance Report – Appendix B
- Natural Heritage Assessment: Evaluation of Significance Report – Appendix C
- Natural Heritage Assessment: Environmental Impact Study
- Natural Heritage Assessment: Confirmation Letter
- Notice of Public Meeting (July 2015)
- Public Meeting Info Boards (July 2015)
- Notice of Public Meeting (August 2015)
- Public Meeting Info Boards (August 2015)
- Community Engagement Summary (2015)
- Notice of Public Meeting (June 2016)
- Public Meeting Info Boards (June 2016)
- Notice of Public Meeting (January 2017)
- Public Meeting Info Boards (January 2017)
- Frequently Asked Questions Document
- Block A Stormwater Management and Erosion & Sediment Control Report
- Block A Civil Design Drawings
- Block B Stormwater Management and Erosion & Sediment Control Report
- Block B Civil Design Drawings
- Block C Stormwater Management and Erosion & Sediment Control Report
- Block C Civil Design Drawings
- Block D Stormwater Management and Erosion & Sediment Control Report
- Block D Civil Design Drawings
- Substation Stormwater Management and Erosion & Sediment Control Report
- Substation Civil Design Drawings